feat(ce-brainstorm): product-tier with end-to-end ID traceability (#629)
This commit is contained in:
@@ -359,6 +359,7 @@ Determine how to proceed based on what was provided in `<input_document>`.
|
||||
- Note any blockers or unexpected discoveries
|
||||
- Create new tasks if scope expands
|
||||
- Keep user informed of major milestones
|
||||
- When the plan or origin document carries stable R-IDs (and optionally A/F/AE IDs), reference them in blockers, deferred-work notes, task summaries, and final verification — not routine status updates. This preserves traceability back to requirements without burying signal under noise.
|
||||
|
||||
### Phase 3-4: Quality Check and Ship It
|
||||
|
||||
|
||||
Reference in New Issue
Block a user